Sign in
7YRSShenzhen Yilong3d Technology Development Co., Ltd.

Overzicht van het bedrijf

Album van het bedrijf

Basisinformatie

Product Capaciteit

Productie Flow

Parts Ready Assembling
According to our design, we selected the best quality outsourcing factory to cooperate and outsourcing our structure parts(Real pictures)
Parts Ready Assembling
According to our design, we selected the best quality outsourcing factory to cooperate and outsourcing our structure parts(Real pictures)
Parts Ready Assembling
According to our design, we selected the best quality outsourcing factory to cooperate and outsourcing our structure parts(Real pictures)
Parts Ready Assembling
According to our design, we selected the best quality outsourcing factory to cooperate and outsourcing our structure parts(Real pictures)
Parts Ready Assembling
According to our design, we selected the best quality outsourcing factory to cooperate and outsourcing our structure parts(Real pictures)

Productie Apparatuur

Naam
Geen
Hoeveelheid
Geverifieerd
Single Pass Printer
BYC168-Z1
1000
Single Pass Printer
BYC168-Z2
500
Single Pass Printer
BYC168-Z3
1000
Single Pass Printer
BYC168-ZS
600
Single Pass printer
BYC168-FS
100
Flatbed printer
BYC168-Multi
100
Geverifieerd

Factory Informatie

Fabrieksgrootte
1,000-3,000 square meters
Fabriekslocatie
4F Building E, Digital Silicon Valley, No.89 Hengping Rd, Henggang St, Longgang District, Shenzhen City, Guangdong Province, China
Aantal productielijnen
5
Productie op contractbasis
OEM Service Offered, Design Service Offered, Buyer Label Offered
Jaarlijkse outputwaarde
US$10 Million - US$50 Million

Productie Lijn

Productie Lijn
Supervisor
NO. van Operators
NO. van In-line QC/QA
Geverifieerd
Assembling line 1
1
5
2
Assembling line 2
1
5
2
Assembling line 3
1
5
2
Assembling line 4
1
5
2
Assembling line 4
1
5
2
Geverifieerd

Kwaliteit Controle

Kwaliteit Management Proces

factory Checking
For every machine we first follow our own Company testing process, following our steps and complete every steps.
Company Standard Test 72 Hours
Checking steps including appearance checking, assembling checking, printing checking, positioning checking etc.
Final Test
Final test of the machine including test of the software, detailed test and quality check of the whole machine.
Ready for delivery
Machines after test would be ready for delivery